
Bathrooms fail behind the tile, not in front of it. Our crews waterproof every shower with a tested membrane system and set tile on flat, level surfaces, so the bathroom looks the same in ten years as it does on the last day.
Every shower gets a bonded waterproofing membrane, flood-tested before tile goes on. Niches, benches and curbless entries are built into the plan from the start, not improvised during the work.
A primary bathroom usually takes three to five weeks. A hall bathroom or a tub-to-shower conversion takes two to three. We give you a dated schedule before we start.
Or call (813) 555-0100

Bathroom in St. Petersburg, 2026

Bathroom in Clearwater, 2025
Free in-home estimate
Tell us what you have in mind and we will call back the same business day to set a visit. The estimate is free and does not commit you to anything.
(813) 555-0100Monday to Friday, 8 am to 6 pm. We speak English and Spanish.